Crystal Creek Lodge, Employee Wastewater Disposal System – King Salmon, AK

PANNONE ENGINEERING SERVICES, LLC developed the design to upgrade the Crystal Creek Lodge’s employee’s quarter’s wastewater disposal system, develop a materials list, and oversaw the construction of the system. The system was located adjacent to a salmon bearing stream and had to meet set back requirements. In addition, the drain field was located on the opposite side of the road from the septic tank. The system was installed fall of 2012.