Eastridge Condominium Renovation Project
PES was called to assess the structural integrity of the home. During the renovation the contractor noticed that the interior walls were separating from the ceiling. We determined that there was a successive “failure” of both the first and second floor due to overloading. The spans for the floor joists were too long for the size of the joists and had deflected over the years. We added a post and beam support system in the crawlspace to support the first floor and a steel frame to support the second floor.