PES worked with Alaska Demolition on the removal of the original Muldoon Bridge since the Double Divergent Diamond version was now active. The removal was a challenge due to many factors. Among them was the close proximity of the new bridges and the age of the bridge. PES was contracted to calculate various segments of the project in relation to the load capacity of the bridge when it came to the cranes and removal of the girders (130,000 pounds a piece).