U-Haul of North Anchorage

PES developed a site design for U-Haul of North Anchorage’s new long term storage center on a 3.5 acre parcel. The site design included the extension of water and wastewater services to the property, storm drain collection and disposal, site design for the two buildings and MOA permitting.